The Challenge

The well has 162 bph static loss and need to be cured and operator already make program to combat losses.

The Action

After receive program to cured losses from operator, held PJSM with comman, production engineer and tool pusher about job deployment. pump 20 bbls lead his vis follow 70 bbls @100 ppb SOLUSEAL, displace with 25 bbls ckay free mud. Squeeze with 9 bbls, bleed of pressure and attempe to reverese circulation. Close and monitored well for one hour.

The Result

Static loss was reduce to ZERO. Operator continue drilling as program.